Electronics
Position the mainboard
The final mainboard mounting position has not yet been established. Choose a suitable mounting position for your instrument.
Connect the sensorboards to the mainboard
Insert the supplied 20 cm 8-pin FPC cable into IN on the rightmost sensorboard, board 4. Connect the other end to SENSOR on the mainboard. The blue side of the cable faces upwards.
Connect the Generic Board
Connect the Generic Board to BREAKOUT on the mainboard using the supplied 40 cm 8-pin FPC cable, with the blue side facing upwards. Generic Board and Breakout board refer to the same board.
The installer determines the position and arrangement of the external connections. Use the board's solder pads for the connections required, such as power, potentiometers and an expression pedal, and wire them accordingly.
Install the sustain sensor
The sustain sensorboard and its magnet are included in the test kit. The installer must determine how to mount and connect them; no specific Wurlitzer sustain-pedal installation has been established yet.